I need a drink...
Much better...
Pretty...uh, where was I?
I'm going to bed, I have a headache.
Random thoughts, mostly about knitting.
I know, I've been rambling, but here's how it worked out...I need a total of 162 stitches for 1/2 of the body.(I chose not to do this in the round so I could have the stability of seams, and I knew that it would be easier for me to keep my place in the pattern if I was only working on half of the sweater at one time.) So my pattern is:
26 stitches of moss stitch,
8 stitches for a 6 stitch right cable(this includes a rev stocking stitch on either side of the cable),
25 stitches for the diamond pattern,
8 stitches for a 6 stitch right cable,
28 stitches for the celtic knot pattern,
8 stitches for a left cable,
25 stitches for the diamond pattern,
8 stitches for a left cable,
and 26 stitches for moss stitch.
Using the EPS, I cast on 10% fewer stitches for the ribbing(2x2 for 2"), increased 16 stitches on the next row in purl stitch(making this the wrong side), and I'm off to the races! I increased in purl so the stitches would recede to the wrong side and that row wouldn't be noticable in the big scheme of things. I could have increased on the last row of ribbing, but quite frankly I didn't think of it. I also added a selvedge stitch to each side to make it easier to seam.
After all that, I think you deserve a picture.